Contents

 

 

 

Page
Title page

 

Executive Summary

8

1

Project Description

10

 

1.1

 

Project Location ………………………………………….…………….

10

 

1.2

 

Project Initiator …………………………………………………………

10

 

1.3

 

Zoning…………………………………………………….....................

10

 

1.4

 

Name, address & Qualifications of Consultant…………………………

10

 

1.5

 

Existing Land Use………………………………………………………

10

 

1.6

 

Climatic Conditions……………………………….……………………

11

 

1.7

 

Geology, landform & Soil Characteristics…………………………….

11

 

1.8

 

Topography……………………………………………………………

11

2

Policy, Legal And Administrative Framework

18

 

2.1

 

Land Ownership……………………………………….……………...

18

 

2.2

 

Statutory Requirements …………...………………………………….

18

 

2.3

 

Land Conversion Certificate…..……………………………………...

18

 

2.4

 

Environmental Impact Assessment (EIA) Licence………..……………

18

 

2.5

 

Morcellement Permit……………………………..………..……………

20

3

Project Justification

36

 

3.1

 

Purpose ………………………………………….…………….

36

 

3.2

 

Layout Description and planning…………………………………...

36

 

3.3

 

Alternative to the proposed undertaking…………………………...

36

 

 

 

 

 

4

Provision of Services

40

 

4.1

 

Roads …………………………………………………………………...

40

 

4.2

 

Road Side Drains ……………………………………………………….

41

 

4.2.1

 

Introduction …………………………………………………………………….

41

 

4.2.2

 

Observation on site…………………………………………………………….

41

 

4.2.3

 

Surface run off …………………………………………………………………

41

 

4.2.4

 

Computation of flood flows and sizing of drains over the project area...

41

 

4.2.5

 

Existing River and Absorption Pit.....………………………………………

45

 

4.3

 

Estimation of Traffic Flow ……………………………….…………….

45

 

4.4

 

Water Resources and Supply …………………………………………...

48

 

4.4.1

 

Water Resources and Supply ………………………………………….……..

48

 

4.4.2

 

The Water Supply Systems ……………………………………………………

48

 

4.4.3

 

Districts Water Supply East ………………………………………………….

48

 

4.4.4

 

Morcellement Connection Point ………………………….…………………

48

 

4.4.5

 

Existing Water Supply Network ……………………………………………..

48

 

4.4.6

 

Water Supply and Development Costs ……………………………………...

48

 

4.4.7

 

Detailed Design of Reticulation Network …………………………….……

48

 

4.4.8

 

Statutory Requirements ……………………………………………….………

49

 

4.5

 

Electricity ………………………………………………………………

50

 

4.6

 

Waste Water Disposal ………………………………………………….

51

 

4.6.1

 

Waste Water Management ……………………………….…………………..

51

 

4.6.2

 

The Approach …………………………………………….……………………

51

 

4.6.3

 

Soil Absorption Characteristics ……………………………………….…….

51

 

4.6.4

 

Sewerage Treatment and Disposal ……………………….…………………

51

 

4.6.5

 

Preliminary Designs of Septic Tank – For Individual Households .……

51

 

4.6.6

 

Leaching Field ……………………………………………...…………………

52

 

4.6.7

 

Detailed Design ……………………………………………………………….

53

 

4.6.8

 

Water Table and Degradation Action …………………….………………..

53

 

4.6.9

 

Desludging ……………………………………………….…………………….

53

 

4.6.10

 

Statutory Requirements ……………………………………………….………

53

 

4.7

 

Solid Waste Disposal …………………………………….……………..

53

 

 

 

 

 

5

Predicted Environmental Impact And Mitigating Measures

57

 

5.1

 

The Rationale …………………………………………….…………….

57

 

5.2

 

The Likely Impacts of Residential Morcellements …………………….

57

 

5.3

 

Assessment of Flora and Fauna ………………………………………...

57

 

5.4

 

Assessment of Air Environment ………………………………………..

57

 

5.5

 

Assessment of Water Environment …………………………………….

58

 

5.6

 

Assessment of Noise …………………………………………………...

59

 

5.7

 

Assessment of Landscape Environment ………………….…………….

59

 

5.8

 

Assessment of Soil and Geology ……………………………………….

59

 

5.9

 

Assessment of Traffic …………………………………….…………….

61

 

5.10

 

Assessment of Socio-Economic Effects ………………….…………….

61

 

5.11

 

Mitigating Measures ……………………………………………………

61

6

Environmental Management Plan During Implementation & At Operational Stage

62

 

6.1

 

Dust……………………………………………………………………..

62

 

6.2

 

Fumes…………………………………………………………………...

62

 

6.3

 

Noise Pollution…………………………………………………………

62

 

6.4

 

Environmental Management Plan ……………………………………..

62

 

6.4.1

 

Operation

65

 

6.4.2

 

Construction Stage

65

 

6.4.3

 

Monitoring Stage

66

 

6.4.4

 

Maintenance Stage

66

 

6.4.5

 

Auditing Stage

66

 

6.4.6

 

Environmental Monitoring Plan Matrix – Operational Phase

67

 

6.4.7